endenl
Search

Blomsma provides pipe marking for HelWin bèta platform

Geplaatst op 10 January 2014

Pipe marking for HelWin bèta – Blomsma Signs & Safety has received the order for the pipe markers for the HelWin bèta platform topsides. The full- service scope includes the project management, engineering, production and installation of the pipe markings. The implementation is based on current laws and regulations, including GHS hazard symbols.

The execution will take place at the Heerema Fabrication Group yard in Zwijndrecht and possibly offshore for various hook-up activities.

The HelWin bèta topsides measures 98 meter in length, 42 meter in width and 28 meter in height with a transmission capacity of 690 MW and is the largest offshore wind platform built by HFG. The HVDC (High Voltage Direct Current) platform weighs 10,200 tons.

Blomsma Signs & Safety has many years of experience in project realization of safety signs in the offshore sector through our full-service method.

With the experience gained from previous projects for offshore wind platforms (BorWin alpha, Dolwin alfa, GlobalTech 1, etc.), we ensure a qualitative realization and relieve our clients in the areas of health and safety signage. Feel free to contact us for more information about the pipe marking for HelWin bèta.

For more information about Heerema you can visit their website: www.heerema.com

More related news

  • Blomsma pipe marking for InfraServ Wiesbaden

    Blomsma pipe marking for InfraServ Wiesbaden

    InfraServ Wiesbaden has awarded Blomsma Signs & Safety GmbH the order for pipe marking at the Kalle-Albert industrial zone wastewater purification plant. ...

  • Blomsma launches PolyesPro pipe marking

    Blomsma launches PolyesPro pipe marking

    Blomsma Signs & Safety developed, in close collaboration with 3M™, a new product line for the marking of pipelines; the PolyesPro pipe marking. The development of the product ori ...